SPECIAL INSPECTION SERVICES
Valuable Inspection Services We Provide:
Tier 1
Concrete, Rammed-Aggregate Piers, Auger-Cast Piles, Fill Placement Observation
- Slump, Temperature, Air Content, Unit Weight Determination
- Concrete Lab Assistance
- Deliver Samples to Lab for Testing
- Auger-Cast Piles
- Casting of Compression Test Cylinders, Cubes, or Prisms and Flexural Beams
- Fill Placement Monitoring
- Fill Material Verification
- Foundation Bearing Capacity
Tier 2
Reinforcing Steel, Post-Installed Anchors, Soil Lab, Soil and Asphalt Compaction
- Verification of Reinforcing Steel Installations
- Compaction Testing with Nuclear Gauge for Soils and/or Asphalt
- Post-Installed Anchor Inspections
- Soil Lab Assistance: Descriptions, Atterbergs, Proctors, Unconfined Compressions
Tier 3
Masonry up to and including 24′-0″ working surface height above surrounding work area
- Observation of Grout and Mortar Mixes
- Observation of Grout Procedures
- Formation of Grout Prisms
- Verification of Reinforcing Steel Size and Placement
- Formation of Mortar Compression Test Specimens
- Block Prism Transport to Lab
Commercial Roofing
- Observation of Insulation Type and Installation
- Observation of Sheet Metal Coping and Flashing
- Observation of Roof Membrane Type and Installation
- Observation of Standing Seam Metal Roof Construction
- Observation of Detail Work and Specialty Items
EIFS / Stucco
- Inspection of Wall Sheathing, Framing and Flatness
- Inspection of Water Barrier
- Inspection of Flashing Around Windows, Doors and Penetrations
- Inspection of EPS Board Attachment
- Observation of Finish Coat Application
- Observation of Rasping Efforts
- Observation of Base Coat Application and Reinforcing Mesh Installation
Wood Framing Inspections
- Observation of Shear Wall Hold-downs and Fastener Patterns
- Shop Inspection of Long-Span Trusses
- Verification of Stud Size and Spacing
- Observation of Wall and Roof Sheathing Type, Thickness, and Rating
Firestopping
- Observation of Firestopping Installations
- Observation and Testing of Spray-Applied Fire-Resistant Material (SFRM)
Tier 4
Masonry exceeding 24′-0″ in height above surrounding work area
- Observation of Grout and Mortar Mixes
- Observation of Grout Procedures
- Formation of Grout Prisms
- Verification of Reinforcing Steel Size and Placement
- Formation of Mortar Compression Test Specimens
- Block Prism Transport to Lab
Structural Steel
- Observation of Bolted and Welded Connections
- Observation of Bridging and Bracing
- Testing of Shear Studs for Composite Concrete Decks
- Observation of Deck Fastener Type and Spacing / Patterns
- Skidmore Test Observation
- Shop Inspection of Shop-Fabricated Assemblies (when required)
Deep Foundations
- Monitoring Drilling Operations
- Drill Logs
- Reinforcing Steel Inspections
- Concrete / Grout Placement Observation
- Concrete / Grout Sampling and Testing
Specialty
- Detention Basin Inspection
- Inspection of Mechanically Stabilized Earth (MSE) Wall Construction
- Proof Roll Observations
- Inspection of Tilt-Up Panel Construction
- Inspection of Draped Cables for Post-Tensioned Slabs
“The ideal civil engineer is one who combines practical knowledge with theoretical science.”
-John A Roebling